Digital Logistics Management – Sydney Metro West

LOCATION: Sydney, Australia
PROJECT: Sydney Metro West

How the Gamuda Australia and Laing O’Rourke Consortium logistics team used DataScope’s Delivery Management System to save time, reduce site congestion, and ensure delivery driver and vehicle compliance on the Sydney Metro West – Western Tunnelling Package.

Background

Gamuda Australia and Laing O’Rourke Consortium were awarded the Sydney Metro West – Western Tunnelling Package in 2022. DataScope were selected to work alongside Select Plant Australia and the project to develop and deploy our Delivery Management System and app across the project. Just over a year later, we caught up with the logistics team to how the project has progressed and how our system is helping.

Gamuda Australia and Laing O’Rourke Consortium (GLC) has been awarded the contract to deliver the Western Tunnelling Package which involves nine kilometres of twin metro rail tunnels between Westmead and Sydney Olympic Park, excavation for two new metro stations, a stabling and maintenance facility at Clyde and a precast facility at Eastern Creek.

The Challenge

With challenging logistics requirements across all five sites, it was important that:

  • A robust system was in place to ensure the logistics team had clear visibility of all project deliveries
  • The booking system was simple to use for suppliers
  • The logistics team could effectively control site congestion
  • All vehicles and drivers arriving on site were safe and compliant

The Solution

Through a partnership approach with the project logistics team, DataScope worked to enhance our existing Delivery Management System to include enhanced project, data capture and compliance requirements.

The solution includes:

Having a delivery management system allows us to go work with certainty as we have a plan for the following day’s activities. DataScope’s Delivery Management System allows us to schedule and juggle deliveries to maximise productivity on site and is a valuable communication and planning tool for our site teams. The system also provides the project team with detailed analytics which are used to measure productivity, resource utilisation, heavy vehicle and driver compliance.”

DANIEL KELLY
Logistics Project Manager Gamuda Australia and Laing O’Rourke Consortium

The Result

With a highly engaged project team who were keen to make the rollout a success, the system has now been live for a year and has been key in driving productivity, mitigating site congestion and monitoring performance and compliance.

Ensuring driver and delivery vehicle safety & compliance

DataScope developed the system so that users were able to capture, review and approve vital driver and vehicle compliance documents. This included ensuring that all heavy vehicle drivers had completed their Sydney Metro Industry Curriculum Training before being approved on the system and had completed their driver induction.

The team are able to quickly generate compliance reports for an instant overview of driver and vehicle compliance status allowing them to ensure a high level of safety standards is maintained across all sites.

Optimised Capacity Utilisation

The logistics team has full control of individual gate capacity, opening times as well as accepted vehicle types. This means that capacity on site is optimised and congestion is reduced.

Setting up for Success

One of the key driving forces of the success of implementing software on construction projects is ensuring that it works for both the central team and the supply chain. Kelly Royter, Logistics Co-Ordinator, Gamuda Australia plays an essential role in ensuring the system’s continued success on the project.

Plan Ahead for the Week Ahead

As well as using DataScope’s logistics and workforce software, the team have recently implemented DataTouch to help transform short-term planning across all trades as well as the way DABs meetings are run.

Previously using a white board for DABs, DataTouch was installed earlier this year to help drive better planning and save time.

Subcontractors use DataTouch’s interactive site drawings to plan their activities up to two weeks in advance where possible. This has allowed them to spot potential issues and clashes early, discuss and resolve them. If anything is missed, it can be updated in DataTouch live in the DABs meeting.

Previously this was a manual exercise which meant that recording and planning for any activities in advance was challenging.

With everyone prepared ahead of time, The DABs meetings have been transformed into a more focused, collaborative session. This has not only saved time for Kier, but also positively impacts the subcontractors every day.

The Delivery Management System helps me to ensure heavy vehicle and driver compliance by capturing all of the information in one place. It’s easy to use and that is perhaps one of its biggest benefits as it is vital to my role that suppliers and subcontractors are able to use the system daily to book their deliveries.”

KELLY ROYTER
Logistics Co-ordinator Gamuda Australia

By carrying out quick training sessions with subcontractors and suppliers, Kelly ensures that the system is used effectively by all and has vastly reduced the need for additional training and support. As a result, almost 15,000 delivery bookings have been made across all sites with activity continuing to ramp up as the project progresses.

Trailer Management

The logistics team worked with DataScope to develop a new feature which allowed them to record and manage trailers separately to vehicles including enforcing a compliance process. This gave the logistics team further control in ensuring safety standards on site.

Having a delivery management system allows us to go work with certainty as we have a plan for the following day’s activities. DataScope’s Delivery Management System allows us to schedule and juggle deliveries to maximise productivity on site and is a valuable communication and planning tool for our site teams."

DANIEL KELLY
LOGISITCS PROJECT MANAGER GAMUDA AUSTRALIA AND LAING O'ROURKE CONSORTIUM

Book a demo

Book a demo with us and we’ll put you in touch with one of our experts to arrange a suitable time and date.

Contact us on:
0845 450 7387